Cairo Metro Line 2 Lender’s Independent Environment, Social and Technical MonitorCairo Metro line 2 has been in operation since 1996, extends from Shubra El Kheima to El Mounib with a total length of 21.5 km including 20 stations.
Feasibility Study and Concept design for 10th of Ramadan / Robeiky/ Belbeis Railway LinkThe 10th of Ramadan – Robeiky – Belbeis Railway link of 62 km connecting 10th of Ramadan Dry Port to the main railway network and the seaports allowing freight traffic from southern ports towards north of the Nile delta