Consultancy & Advisory Services

Procurement Implementation Assistance for the Renewal Programme & Supply of 100 Locomotives

Egyptian National Railways (ENR) purchases 100 new locomotives under a supply and maintain contract to operate on passenger long distance routes.

Definition of the Strategy for the Reform of the Railway Sector in Egypt

Restructuring program aiming at improving railway safety, increasing rail transport competitiveness, and improving the financial situation of the Egyptian National Railways ENR including all major aspects of railway activities.

Pre-Feasibility Study for Bus Rapid Transit BRT in 6th of October City and New Cairo City

NUCA, represented by GOPP, is taking a positive step in establishing a modernized and enhanced system of urban Bus Rapid Transit BRT Project. In both of 6th of October City, west of Cairo, and New Cairo City, east of Cairo.

6th of October Dry Port

Creation of the first dry port in Egypt. Located in the vicinity of the 6th of October City west of Cairo, connected by rail to the Greater Port of Alexandria (GPA) container Hub and adjacent to the future 6th  of October Airport.

ENR Environmental, Health and Safety (EHS) Capacity Building Phases I and II

The European Bank for Reconstruction and Development (EBRD) developed a project with ENR (Phase I) to support its transformation to become a more efficient operator and to improve the safety and services provided to its users through rolling stock renewal,

Feasibility Study of High-Speed Railway HSR Cairo / Luxor with extension to Aswan and Hurghada

Feasibility study for the Egyptian railway sector for the construction, operation, space requirements and investment needed for a high-speed line between Cairo and Luxor (Egypt) with a possible extension to Aswan and Hurghada.

Pre-Feasibility Study for Cairo Western Railway Bypass

Closely linked to the 6th of October Dry port PPP – Value Added Logistic center project 40 kilometers west of Cairo.

Migration to ETCS Level 1 on board and track side of Alexandria/ Cairo/ Asyut Main Corridor – Preliminary design

Design the most cost-effective migration strategy from the current ENR ATC system to the international standard ETCS Level 1 on board and trackside on the Alexandria – Cairo – Asyut main corridors.
Load more