The scope of work for the contractors is split in 6 main groups of works as follows:
Group 1: Signalling and driving modes, centralized control and telecommunications.
Group 2: Civil works.

Technical Support for the Supply and Installation of Simulator for Cairo Metro Line1
Supply, install and operate a complete system of driving simulator system for training the drivers with the complete commitment to the technical specifications and terms stated in the tender documents