Menarail
  • Home
  • About
  • Projects
    • Consultancy & Advisory Services
    • Procurement & Tendering
    • Contract Adminstration
    • Construction Supevision
    • Project Mangement
    • Testing and Comissioning
  • Our Partners
  • Contact Us
    • Send Us Email
    • Work With Us
  • News
  • Search
  • Menu Menu
All 2 /Construction Supevision 0 /Consultancy & Advisory Services 2 /Contract Adminstration 0 /Procurement & Tendering 0 /Project Mangement 0 /Testing and Comissioning 0

Cairo Metro Line 2 Lender’s Independent Environment, Social and Technical Monitor

Cairo Metro line 2 has been in operation since 1996, extends from Shubra El Kheima to El Mounib with a total length of 21.5 km including 20 stations.

Feasibility Study and Concept design for 10th of Ramadan / Robeiky/ Belbeis Railway Link

The 10th of Ramadan – Robeiky – Belbeis Railway link of 62 km connecting 10th of Ramadan Dry Port to the main railway network and the seaports allowing freight traffic from southern ports towards north of the Nile delta
Load more
All 2 /Consultancy & Advisory Services 2

Cairo Metro Line 1 Modernisation – Lenders Supervisor

The Cairo Metro Line 1 rehabilitation aims to enhance capacity and service quality. This initiative will reduce headways from 3.5 minutes to 2.5 minutes

El Dekheila MPP Terminal Feasibility Study – Stakeholder Engagement

The main objective of the feasibility study was to assess the development of a new multipurpose terminal at El Dekheila port
Page 1 of 18123›»

INTERESTING LINKS

Business Hours

Tel: (202) 2290 3782

  • Sunday-Thursday: 9am to 5pm
© Copyright - Menarail
  • Facebook
  • LinkedIn
Scroll to top