Feasibility Study and Demand Assessment for the construction of a freight railway line connecting Manashy/Itay Elbaroud line with the logistic port at km 66, Giza/Wahat line.
Feasibility study for the construction of a freight railway line connecting Manashy/Itay El-Baroud line with the 6th of October Dry port at km 66 Giza/Wahat line.