Client
- Agence Française de Développement AFD
- National Authority for Tunnels NAT
Partner
- Transurb
Project Description
The scope of work for the contractors is split in 6 main groups of works as follows:
- Group 1: Signalling and driving modes, centralized control and telecommunications.
- Group 2: Civil works.
- Group 3: Power supply, electromechanical equipment, rolling stock maintenance facilities including maintenance management system (mms)
- Group 4: Track works
- Group 5: Rolling stock
- Group 6: Toll equipment
Timeline
Sep 2015 – June 2017
MENA Rail Role
- Assisted ENR during the bidding process.
- Assisted ENR in evaluating the offers received from bidders/contractors and with the preparation of the bid assessment reports.
- Assisted ENR with the negotiations and drafting of contract documentation with the awarded bidders.
- Submitted to ENR detailed indicative reports with conclusions and recommendations as to the most suitable tenders to be accepted for each of the 6 lots.