International Bank for Reconstruction and Development (IBRD)
Egyptian National Railway (ENR)
Partner
ITALFERR
Project Description
Design the most cost-effective migration strategy from the current ENR ATC system to the international standard ETCS Level 1 on board and trackside on the Alexandria – Cairo – Asyut main corridors.
Timeline
May 2016 – Ongoing
MENA Rail Role
Prepared & designed the migration strategy for the most cost- migration to move from the current ENR ATC system to the international standard ETCS Level1 on board and trackside for the project main corridor.
Supervising and the realization of the project.
Assured coherence with the signalling modernization projects in progress on the main ENR corridors
Prepared a preliminary evaluation of costs for the migration to ETCS Level 1
Prepared functional specifications, and preliminary design for the migration to ETCS Level 1
Prepared the documents for the prequalification of bidders and assisted in the evaluation of prequalification requests