Feasibility study for the construction of a freight railway line connecting Manashy/Itay El-Baroud line with the 6th of October Dry port at km 66 Giza/Wahat line.
Timeline
July 2020 – March 2021
MENA Rail Role
The company conducted feasibility studies for the following:
Marketing feasibility for the construction of the new railway line.
Technical feasibility for the construction of the new railway line.