Pre-Feasibility Study for Cairo Western Railway BypassClosely linked to the 6th of October Dry port PPP – Value Added Logistic center project 40 kilometers west of Cairo.
Migration to ETCS Level 1 on board and track side of Alexandria/ Cairo/ Asyut Main Corridor – Preliminary designDesign the most cost-effective migration strategy from the current ENR ATC system to the international standard ETCS Level 1 on board and trackside on the Alexandria – Cairo – Asyut main corridors.