Executing a pilot project on Ramleh line in Alexandria Including renewing 800 m CWT ballasted track, Introducing Embedded Rail system in 2 level crossings (Ibrahim Mosque and Hassan Rasem) for the first time in Egypt, and constructing 2 manual control switches.